Waterway for LCCD

For this project we worked with the Lancaster County Conservation District at a local farm to create this waterway. Our first step was to strip the topsoil off and shape the waterway. Then, we graded it before adding seed. After the seed and fertilizer were applied, we installed matting. The finished product was a 2,000 foot long waterway.